A focused inspection process designed to turn
technical requirements into reliable,
actionable information.
01
UNDERSTAND
Understand the Requirement
The project-specific requirement
that targets examination of non-ferromagnetic tube bundles (heat exchangers,
boilers) to detect discontinuities without disassembly.
02
INSPECT
Inspect with Purpose
A bobbin or array
eddy-current probe is passed through each tube to induce and measure
electromagnetic response.
03
ANALYSE
Analyse the Findings
Signal amplitude and phase
are analysed against calibration standards to detect and size wall loss,
pitting, and cracking.
04
REPORT
Report for Action
A tube-by-tube condition
report with defect location and severity that supports retubing / plugging
decisions is issued.